You must be a CTBUH Member to view this resource.
10 Holloway Circus
Beetham Tower
Building
Completed, 2006
B1
residential / hotel
concrete
130.0 m / 427 ft
39
4
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
12 June 2013 | Birmingham
London and Beyond: Regionalism and the British Skyscraper
There are very few architects who have built tall buildings across numerous cities in the UK, and yet several cities outside London have enthusiastically embraced...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy