110 North Wacker
Bank of America Tower
Building
Architecturally Topped Out
60606
office
composite
249.0 m / 817 ft
56
2
110
30
8 m/s
164,438 m² / 1,769,996 ft²
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
Tour 110 North Wacker with CTBUH Chicago (Sold Out)
25 July 2019 - Event
CTBUH Chicago Hosts Panel Discussion at the CAC
22 May 2019 - Event
Located along the South Branch of the Chicago River, 110 North Wacker was constructed upon a trapezoidal shaped site presenting design challenges in creating desirable lease spans while accommodating for a publicly accessible riverwalk of at least 9.1 meters (30 feet) in width, as required by city ordinance for any riverfront development site. These challenges were addressed by placing the building core within the center of the composite structure and taking the unusual approach of staggering the core walls to maintain a 13.7 meter (45 foot) span of leasable office space on each side of the building. This staggering of the core walls is then reflected in a series of rectilinear setbacks along the west façade, maintaining an orthogonal 1.5 meter (five foot) planning module throughout the building while providing for the equivalent of 14 corner offices per floor.
The building structure is composed of column-free floor spans framed with steel beams linking the central reinforced concrete core to a series of steel perimeter columns which transition into three trident shaped trusses on the riverfront creating an arcade for the riverwalk, which in conjunction with a small pocket park to the north, provides for 50 percent of the site being open-air public space at street level.
25 July 2019
Join the Chicago Chapter of the CTBUH in exploring the design and construction of 110 North Wacker, an under-construction 57-story office tower.
22 May 2019
The Chicago Chapter of the CTBUH hosted a panel discussion at the CAC on the topics of new construction, refurbishment and affordability in relation to the city of Chicago.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy