Filter by
You must be a CTBUH Member to view this resource.
181 Fremont
Park 181
Building
Completed, 2018
94105
residential / office
steel
LEED Platinum targeted
246.9 m / 810 ft
56
5
67
199
17
62,263 m² / 670,193 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
Best Tall Building 200-299 meters 2019 Award of Excellence
2019 CTBUH Awards
Structural Engineering Award 2019 Winner
2019 CTBUH Awards
MEP Engineering Award 2019 Award of Excellence
2019 CTBUH Awards
CTBUH Releases Year in Review: Tall Trends of 2018
12 December 2018 - CTBUH News
CTBUH 2019 Award of Excellence Winners Announced
5 December 2018 - Awards
18 September 2014 | San Francisco
A LEED Platinum Global Model for Vertical Urbanism
Every key aspect of sustainable urbanism is incorporated and integrated into the tallest mixed use, LEED Platinum tower on the west coast of North America,...
25 April 2019
Best Tall Buildings 2019: Dominant Trends
CTBUH
This year, CTBUH has vastly expanded its Awards program to consider the Best Tall Building category through several classes of height, rather than geographic regions,...
18 September 2014 | San Francisco
A LEED Platinum Global Model for Vertical Urbanism
Every key aspect of sustainable urbanism is incorporated and integrated into the tallest mixed use, LEED Platinum tower on the west coast of North America,...
03 March 2008 | San Francisco
San Francisco: Promoting Tall Buildings Through Sustainable Incentives
Jeffrey Heller & Clark Manus, of Heller Manus, talked about San Francisco as an interesting and prototypical example of what is and will be happening...
25 April 2019
Best Tall Buildings 2019: Dominant Trends
This year, CTBUH has vastly expanded its Awards program to consider the Best Tall Building category through several classes of height, rather than geographic regions,...
12 December 2018
Year in Review: Tall Trends of 2018
The astronomical growth in tall building construction observed over the past decade continued in 2018, though the total number of completed buildings of 200 meters’...
16 September 2014
A LEED Platinum Global Model for Vertical Urbanism
Every key aspect of sustainable urbanism is incorporated and integrated into the tallest mixed use, LEED Platinum tower on the west coast of North America,...
03 March 2008
San Francisco: Promoting Tall Buildings Through Sustainable Incentives
The past decades have shown some major changes in our urban settlements. The globalization of our societies and economies has brought change to cities. This...
12 December 2018
The astronomical growth in tall building construction observed over the past decade continued in 2018, though the total number of completed buildings of 200 meters’ or greater height leveled off at 143, after hitting an all-time record of 147 in 2017.
5 December 2018
These projects will be represented at the CTBUH 2019 Tall + Urban Innovation Conference, where they will compete in real time for winning distinctions in each category.
22 August 2018
CTBUH has released a Tall Buildings in Numbers (TBIN) interactive data study on the world's tallest buildings with dampers.
20 September 2017
CTBUH Beijing hosted the Innovative Building-Making presentation at Arup’s Beijing office, where industry experts discussed the design of some of their most innovative projects.
30 October 2015
CTBUH 2015 delegates toured San Francisco and its architectural marvels, from new construction to old historic buildings.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy