You must be a CTBUH Member to view this resource.
235 West Van Buren
Building
Completed, 2010
60606
residential
concrete
149.4 m / 490 ft
46
714
572
6
88,300 m² / 950,453 ft²
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
Located in the South Loop neighborhood of downtown Chicago, 235 Van Buren is a residential tower containing studios, and one- and two-bedroom condominiums targeted for people buying their first home. The site is located on the southern edge of the central business district of Chicago. Its architecture is a response to two site conditions. The first condition, to the north, is the densely in-filled context of the Chicago “Loop.” The second condition, to the south, is an open space created by a freeway and traffic interchange which also contains a small park.
The articulation of the two masses is distinctly different to respond to these two conditions. The southern glass façade and random balconies provide a large-scale backdrop to the open space created by a major traffic interchange. A ribbon of concrete frames this glass wall, undulating to define the penthouse units and providing a large-scale gesture to the expressway as well as the taller buildings to the north. The random balconies express the individuality of the units within, providing a kinetic image from the freeway and helping shade the south facing glass.
The northern façade is a flush grid of rectangular openings with inset balconies. This gesture relates the building back to the historic Chicago Loop and the frame-expressed architecture of the “Chicago School.”
In order to keep costs down and make the units more affordable, units are designed with borrowed-light bedrooms behind living spaces with 3m (10ft) ceilings to form a loft-like living arrangement. This allows the building to be wider than the standard residential tower and reduce exterior enclosure costs. In order to reduce the effect of this extra width, the overall mass of the building is broken down by dividing the tower into two slabs. This concept also provides an urban space at the street corner which relates to the existing plaza on the opposite corner and pronounces the entry to the residences. The massing break-down is further accentuated by differentiating the heights of the two shifted slabs at the top of the building. Principles of urban densification are incorporated into the design, with highly efficient unit planning and a district plant-sourced chilled-water supply. The building’s green roof and capture of abundant natural light assist in cutting down overall energy costs.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy