Filter by
You must be a CTBUH Member to view this resource.
35xv
Xavier High School, 31 West 15th Street
Building
Completed, 2016
10011
residential / education
concrete/steel
LEED Silver
101.8 m / 334 ft
25
1
57
4
3.56 m/s
16,162 m² / 173,966 ft²
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
Best Tall Building Americas 2018 Award of Excellence
2018 CTBUH Awards
30 May 2018 | New York City
Interview: Joel Breitkopf & Daniel Kaplan | 35xv
Joel Breitkopf, Principal of Alchemy Properties, and Daniel Kaplan, Senior Partner of FXCollaborative, are interviewed by Chris Bentley regarding the Best Tall Building Americas –...
30 May 2018 | New York City
Interview: Joel Breitkopf & Daniel Kaplan | 35xv
Joel Breitkopf, Principal of Alchemy Properties, and Daniel Kaplan, Senior Partner of FXCollaborative, are interviewed by Chris Bentley regarding the Best Tall Building Americas –...
30 May 2018 | New York City
Vertical Integration: An Educational/Residential Community Rises
Rising 102 meters above a mid-block site, 35XV is a unique, hybrid residential-academic building located in Manhattan’s vibrant Chelsea neighborhood. Utilizing excess development rights from...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy