This project is a renovation and replaced Lockton House
You must be a CTBUH Member to view this resource.
6 Bevis Marks
Building
Completed, 2014
EC3A 7BA
office
composite
BREEAM Excellent
74.0 m / 243 ft
17
2
7
20,700 m² / 222,813 ft²
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
A new, highly efficient building designed to provide Grade-A office space and retail in the heart of the City, 6 Bevis Marks replaces an outdated 1980s structure. Its nine floors include three private roof terraces, a sky court on the roof, and double the previous public space. On the lower floors, the elevations are a modern interpretation of the richly textured and shaped faience cladding of the nearby Holland House. This is most apparent where the cladding is brought forward of the glass façade line to read almost as a solid mass when viewed obliquely.
An ETFE floating roof structure turns the rooftop into an all-weather, open air, landscaped space with spectacular views. The roof structure drops in front of the four upper floors to help support the cantilevered shading. Despite doubling the floor area of the original building, the new structure is 80 percent more energy-efficient and reuses 50 percent of the original structural mass.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy