You must be a CTBUH Member to view this resource.
7 Bryant Park
1045 Sixth Avenue
Building
Completed, 2016
10018
office
composite
LEED Gold BD+C: Core and Shell
138.4 m / 454 ft
29
2
10
44,000 m² / 473,612 ft²
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
7 Bryant Park Office Building Tour
28 October 2015 - Event
16 September 2014 | New York City
Stainless Steel Claddings for High-Rise Architecture
Especially during the last 20 years stainless steel has become an approved and much valued cladding material for sophisticated architecture. Starting with the first architectural...
According to Pei Cobb Freed & Partners, the program needed a building to conform to the zoning envelope and setbacks of the site while maximizing office floor plates and providing around 474,000 square feet of office space. 7 Bryant Park sits diagonally from Bryant Park calling for a design gesture through two conical incisions carved into the building volume, one pointing up, the other down, with their apexes touching at the mandated setback level. 7 Bryant Park has retail space of up to 6,200 square feet, flexible corporate floor plans, and outdoor terraces on the 10th and 14th floor overlooking Bryant Park. 7 Bryant Park has also received LEED Gold boasting features like a living green wall with 2,700 plants in the lobby and ability to collect 30,000 gallons of storm water.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy