You must be a CTBUH Member to view this resource.
AC Hotel Barcelona
AC Hotel, Hotel AC Barcelona, AC Hotel Barcelona Forum
Building
Completed, 2004
08019
hotel
concrete
93.9 m / 308 ft
22
1
368
29,317 m² / 315,566 ft²
Construction Start
Completed
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy