Al Bahar Tower 2
ADIC Headquarters Tower 2, Abu Dhabi Investment Council Headquarters Tower 2
Building
Completed, 2012
office
composite
145.1 m / 476 ft
29
2
804
9
5 m/s
56,000 m² / 602,779 ft²
Proposed
Construction Start
Completed
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
Al Bahar Towers Chosen as Featured Building
1 January 2013 - Featured Building
18 October 2012 | Abu Dhabi
Best Tall Building Innovation Award: Al Bahar: Innovating the Intelligent Skin
Al Bahar Towers’ innovative dynamic façade opens and closes in response to the movement of the sun, creating a more comfortable internal environment for occupants...
While many buildings in the Middle East have attempted to deal with the consistent issue of solar gain in such a hot, arid climate, Al Bahar Towers has taken a dramatic approach to addressing the issue. The towers themselves are simply clad curtain wall buildings, but instead of relying on tinted or highly reflective glazing to mitigate solar effects, they utilize an intricate and dynamic external shading system referred to as the “mashrabiya.”
In designing the two towers, the approach considered the renewed interest in energy efficiency in Abu Dhabi, as well as the desire to use modern technology to meet their goals. A circular form was proposed for its efficiency of wall-to-floor area and reduced amount of surface area, which was then refined iteratively to get the final form. The towers taper at the top and bottom and widen toward the middle, and was generated from a pre-rationalized geometry derived from the Islamic composition. This process was undertaken by means of parametric and algorithmic computer studies.
To fully combat the effects of solar glare and heat gain, the team looked for a method to shield the glazed towers in a unique and creative way. By studying the traditional and vernacular architecture of the area, the “mashrabiya,” a wooden lattice screen used predominantly in Islamic architecture, became the inspiration for the towers’ active skin.
The façade’s moveable components are semi-transparent PTFE (polytetrafluoroethylene) panels, which are combined in arrays much like umbrellas. Each array opens and closes in direct reaction to the sun’s position, allowing indirect sunlight to enter the building while blocking the strongest rays to prevent glare and heat gain. While the system improves the comfort and light in the spaces inside, it also reduces the need for artificial lighting and overall cooling loads. This innovative external shading system is also being recognized as the inaugural winner of the CTBUH “Innovation” award.
Internal sky gardens exist along the southern façade of the building which, in addition to the exterior shading, help alleviate the effects of solar exposure. These areas also serve as an amenity to users, who utilize the spaces for meetings or breaks.
The façade system challenges the typical high-rise typology of the area, suggesting that more responsive and dynamic solutions to climactic conditions are more appropriate than attempting to statically handle them through designs based on non-regional traditions. Al Bahar Towers seeks to provide both a contextual and culturally sensitive design while also utilizing modern technology to meet higher standards of efficiency.
The podium accommodates a range of shared facilities including prayer rooms, restaurants, and an auditorium, while enabling segregated access to be achieved for various categories of users including members of the public, staff, and VIPs who are provided with discreet access from the upper landscaped deck. There are two levels of basement parking and a mezzanine area is provided within the podium as a meeting point for staff.
The design of Al Bahar Towers may also be seen as a response to a number of other initiatives that were being launched within the Emirate at the time of their conception, including publication of the Abu Dhabi 2030 Plan, comprising a comprehensive development framework based upon the principles of cultural and environmental responsibility, together with development of the Estidama environmental management standard and promotion of the Masdar initiative on renewable energy.
18 October 2012 | Abu Dhabi
Best Tall Building Innovation Award: Al Bahar: Innovating the Intelligent Skin
Al Bahar Towers’ innovative dynamic façade opens and closes in response to the movement of the sun, creating a more comfortable internal environment for occupants...
18 October 2012 | Abu Dhabi
As the inaugural winner of the Innovation Award, Peter Chipchase & Peter Oborn discuss the highly technical aspects of the Al Bahar Towers' dynamic shading...
05 February 2010 | Abu Dhabi
Dynamic Facades and Parametrics: Creating a New Vernacular?
Aedas presents their competition winning proposals for a new headquarters building for the Abu Dhabi Investment Council. The concept is derived from an algorithmic composition,...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy