Ann & Robert H. Lurie Children's Hospital of Chicago
Lurie Children's Hospital, Children's Memorial Hospital
Building
Completed, 2012
60611
hospital
composite
136.2 m / 447 ft
22
1
27
2.54 m/s
116,400 m² / 1,252,919 ft²
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
SCB Hosts IIT Students for Office Visit, Lurie Hospital Tour
23 February 2018 - Event
The Ann & Robert H. Lurie Children’s Hospital demonstrates a unique approach to high-rise hospital design. By moving to a neighborhood in downtown Chicago, the client wished to leverage opportunities for collaboration in patient care, teaching, and research with Northwestern University. This location, however, offered some distinct design challenges. At 1.25 million square feet, on a site area of 1.8 acres, the hospital required a creative approach to the building stack.
The results include a number of unique features, including an 11th floor sky lobby and sky garden, and public amenities on the 11th and 12th floors. Loading areas, in addition to the elevators and an entrance lobby, took up most of the available first floor area, the remainder being too small to accommodate the area programmed for the Emergency Department, which was assigned to the second floor. This solution improved operational efficiency in a high-rise hospital, through the standardization of processes and work flows.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.