You must be a CTBUH Member to view this resource.
Bavaria Towers, White Tower
Hyperion Hotel München
Building
Completed, 2019
hotel
concrete
53.6 m / 176 ft
15
345
140
15,150 m² / 163,073 ft²
Construction Start
Completed
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy