You must be a CTBUH Member to view this resource.
Belfer Research Building
Weill Cornell Medical College
Building
Completed, 2014
10021
hospital
concrete
LEED Gold
91.4 m / 300 ft
18
9
3.56 m/s
46,410 m² / 499,553 ft²
Proposed
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy