Bitexco Financial Tower
The Financial Tower of Ho Chi Minh City
Building
Completed, 2010
office
concrete
262.5 m / 861 ft
68
4
100
14
114,000 m² / 1,227,086 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
Warm Weather Spaces Walking Tours 2015
17 September 2015 - Event
CTBUH Releases Analysis of Global Population and Tall Buildings
13 April 2011 - CTBUH Journal
11 June 2014
CTBUH Research
In this installment of Tall Buildings in Numbers, CTBUH considers how helipads are used on skyscrapers, and which are the highest in the world. The...
Located in the historic district of Ho Chi Minh City, the Bitexco Financial Tower rises as a Beacon towards the future of Vietnam. The tower uses as its reference the Lotus flower (a symbol of Vietnam) in a mature, blossomed state to build upon Vietnam’s history. The tower is characterized by a distinctive helipad—not located on the roof as is the norm—but cantilevered out from the 55th floor while the building continues to rise above it. Consistent with the national flower motif, the helipad and sky lounge taper off from the central area, reaching into the atmosphere as if a lotus bud in search of the sun.
The glass curtain wall swirls petal-like around the tower’s façade. The structure employs a reinforced concrete core with steel outriggers. Supporting the helipad are a pair of steel cantilever girders which span from the core walls to the perimeter tower columns and extend outward to frame the platform. Perpendicularly-oriented secondary structural steel beams cantilever beyond the primary girders to support the circular edge.
11 June 2014
In this installment of Tall Buildings in Numbers, CTBUH considers how helipads are used on skyscrapers, and which are the highest in the world. The...
10 October 2011
Prediction and Compensation of Column Shortening for Bitexco Financial Tower
The effects of column shortening, both elastic and inelastic, take on added significance need special consideration in design and construction. Axial shortening of columns due...
13 April 2011
Tall and Urban: An Analysis of Global Population and Tall Buildings
Tall buildings are spreading across the globe at an ever-increasing rate. This study demonstrates the relationship between population and tall buildings across those countries and...
31 December 2010
Tallest Buildings Completed in 2010
In a year dominated by news coverage of the new “World’s Tallest Building” – Burj Khalifa, Dubai – one may be surprised to learn that,...
17 September 2015
The CTBUH Urban Habitat / Urban Design Committee organized guided walking tours of 16 cities around the globe, focusing on urban habitats around tall buildings.
13 April 2011
Tall buildings are spreading across the globe at an ever-increasing rate. This study demonstrates the relationship between population and tall buildings across those countries and presents information on the average height and age of each country’s tallest buildings.
31 December 2010
In a year dominated by news coverage of the new “World’s Tallest Building” – Burj Khalifa, Dubai – one may be surprised to learn that, besides being the year in which a building first surpassed the 600, 700, and 800-meter thresholds, 2010 has seen the completion of more skyscrapers than any previous year in history.