Note: As this project is under construction, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by the CTBUH.
You must be a CTBUH Member to view this resource.
BMO Tower
Union Station Redevelopment Tower
Building
Under Construction
60606
office
composite
221.7 m / 727 ft
50
2
334
29
142,799 m² / 1,537,076 ft²
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
26 March 2020
Under-Construction Chicago Skyscrapers Acquire New Tenants
Real estate investment firm Heitman has inked a lease for 60,000 square feet (5,600 square meters) at Riverside Investment & Development and Howard Hughes’ under-construction...
26 March 2020
Under-Construction Chicago Skyscrapers Acquire New Tenants
Real estate investment firm Heitman has inked a lease for 60,000 square feet (5,600 square meters) at Riverside Investment & Development and Howard Hughes’ under-construction...
20 December 2019
Skyscraper Projects in Chicago’s Near West Side Move Forward
Global architecture firm Goettsch Partners (GP) announced the groundbreaking on 20 December 2019 for Union Station Tower, also known as BMO Tower, a new 50-story...
05 December 2019
Chicago Skyscraper Plans to Start Construction After Securing Financial Backing
Work is set to begin in December 2019 on a 1.5 million-square-foot (139,000-square-meter) office tower alongside Union Station, after the developers landed a US$476 million...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy