37
Global
Height rank

Burj Mohammed Bin Rashid

Abu Dhabi
Height 381.2 m / 1,251 ft
Floors 88
Official Name
The current legal building name.

Burj Mohammed Bin Rashid

Other Names
Other names the building has commonly been known as, including former names, common informal names, local names, etc.

World Trade Center Abu Dhabi - The Residences

Name of Complex
A complex is a group of buildings which are designed and built as pieces of a greater development.

World Trade Center Abu Dhabi

Type
CTBUH collects data on two major types of tall structures: 'Buildings' and 'Telecommunications / Observation Towers.' A 'Building' is a structure where at least 50% of the height is occupied by usable floor area. A 'Telecommunications / Observation Tower' is a structure where less than 50% of the structure's height is occupied by usable floor area. Only 'Buildings' are eligible for the CTBUH 'Tallest Buildings' lists.

Building

Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished

Completed, 2014

Country
The CTBUH follows the United Nations's definition of Country, and thus uses the lists and codes established by that organization.

United Arab Emirates

City
The CTBUH follows the United Nations's definition of City, and thus uses the lists and codes established by that organization.

Abu Dhabi

Postal Code

51133

Function
A single-function tall building is defined as one where 85% or more of its usable floor area is dedicated to a single usage. Thus a building with 90% office floor area would be said to be an "office" building, irrespective of other minor functions it may also contain.

A mixed-use tall building contains two or more functions (or uses), where each of the functions occupy a significant proportion of the tower's total space. Support areas such as car parks and mechanical plant space do not constitute mixed-use functions. Functions are denoted on CTBUH "Tallest Building" lists in descending order, e.g., "hotel/office" indicates hotel function above office function.

residential

Structural Material
Steel
Both the main vertical/lateral structural elements and the floor spanning systems are constructed from steel. Note that a building of steel construction with a floor system of concrete planks or concrete slab on top of steel beams is still considered a “steel” structure as the concrete elements are not acting as the primary structure.

Reinforced Concrete
Both the main vertical/lateral structural elements and the floor spanning systems are constructed from concrete which has been cast in place and utilizes steel reinforcement bars.

Precast Concrete
Both the main vertical/lateral structural elements and the floor spanning system are constructed from steel reinforced concrete which has been precast as individual components and assembled together on-site.

Mixed-Structure
Utilizes distinct systems (e.g. steel, concrete, timber), one on top of the other. For example, a steel/concrete indicates a steel structural system located on top of a concrete structural system, with the opposite true of concrete/steel.

Composite
A combination of materials (e.g. steel, concrete, timber) are used together in the main structural elements. Examples include buildings which utilize: steel columns with a floor system of reinforced concrete beams; a steel frame system with a concrete core; concrete-encased steel columns; concrete-filled steel tubes; etc. Where known, the CTBUH database breaks out the materials used in a composite building’s core, columns, and floor spanning separately.

concrete

Height
Architectural
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the architectural top of the building, including spires, but not including antennae, signage, flag poles or other functional-technical equipment. This measurement is the most widely utilized and is employed to define the Council on Tall Buildings and Urban Habitat (CTBUH) rankings of the "World's Tallest Buildings."

381.2 m / 1,251 ft

To Tip
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest point of the building, irrespective of material or function of the highest element (i.e., including antennae, flagpoles, signage and other functional-technical equipment).
381.2 m / 1,251 ft
Occupied
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest occupied floor within the building.
352.3 m / 1,156 ft
Floors Above Ground
The number of floors above ground should include the ground floor level and be the number of main floors above ground, including any significant mezzanine floors and major mechanical plant floors. Mechanical mezzanines should not be included if they have a significantly smaller floor area than the major floors below. Similarly, mechanical penthouses or plant rooms protruding above the general roof area should not be counted. Note: CTBUH floor counts may differ from published accounts, as it is common in some regions of the world for certain floor levels not to be included (e.g., the level 4, 14, 24, etc. in Hong Kong).

88

Floors Below Ground
The number of floors below ground should include all major floors located below the ground floor level.

5

# of Apartments
Number of Apartments refers to the total number of residential units (including both rental units and condominiums) contained within a particular building.

474

# of Elevators
Number of Elevators refers to the total number of elevator cars (not shafts) contained within a particular building (including public, private and freight elevators).

13

Top Elevator Speed
Top Elevator Speed refers to the top speed capable of being achieved by an elevator within a particular building, measured in meters per second.

7 m/s

Rankings
#
37
Tallest in the World
#
6
Tallest in Middle East
#
4
Tallest in United Arab Emirates
#
1
Tallest in Abu Dhabi
#
4
Tallest Residential Building in the World
#
3
Tallest Residential Building in Middle East
#
3
Tallest Residential Building in United Arab Emirates
#
1
Tallest Residential Building in Abu Dhabi
#
7
Tallest Concrete Building in the World
#
4
Tallest Concrete Building in Middle East
#
3
Tallest Concrete Building in United Arab Emirates
#
1
Tallest Concrete Building in Abu Dhabi
Construction Schedule
2006

Proposed

2007

Construction Start

2014

Completed

Architect
Design

Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.

Other Consultant

Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).

Façade

These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.

Façade Maintenance
Wind
Material Supplier

Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).

Façade Maintenance Equipment
Hardware
Developer
Aldar Properties
Architect
Design

Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.

Structural Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

Halvorson and Partners
MEP Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

chapmanbdsp
Project Manager

The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.

Atkins
Main Contractor

The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.

Arabian Construction Company
Other Consultant

Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).

Civil
V3 Companies
Façade

These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.

Façade Maintenance
Vertical Transportation
MovvéO Ltd.
Wind
Material Supplier

Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).

Cladding
Yuanda
Façade Maintenance Equipment
Flooring
SANTA MARGARITA
Hardware

CTBUH Awards & Distinctions

Best Tall Building Middle East & Africa 2015 Winner

2015 CTBUH Awards

CTBUH Initiatives

The Middle East: 30+ Years of Building Tall

28 November 2018 - CTBUH Research

Top Company Rankings: The World’s 100 Tallest Buildings

13 October 2016 - CTBUH Research

Videos

12 November 2015 | Abu Dhabi

2015 Awards - Session 3 Q&A

Yoram Eilon, Seinor Vice President, WSP | Parsons Brinckerhoff, Kenneth Lewis, Managing Partner, Skidmore, Owings & Merrill, Hin Kong Poon, Deputy Chief Development Officer, CapitaLand...

Research

20 October 2018

The Middle East: 30+ Years of Building Tall

CTBUH Research

The Middle East region is hosting its first CTBUH International Conference since 2008. In that year, there were 119 completed buildings of 150 meters or...

About Burj Mohammed Bin Rashid

The Burj Mohammed Bin Rashid is located in the heart of Abu Dhabi at the site of the old Central Market, a traditional crossroads and meeting point in the city. The tower’s central location provides residents with easy access to major points of interest, including the nearby Mall at the World Trade Center and the Corniche, a waterfront promenade that runs along the coast. As part of the larger World Trade Center complex, Burj Mohammed Bin Rashid is just one element of a 700,000-square-meter mixed-use development, which also includes an office building and a hotel. The site also includes a traditional souk, up to seven levels of retail in the podium, a green roof above the market, and a bridge system linking these areas together.

The tower is intended to fit within its desert context. A smooth, sleek, and reflective façade is designed to require minimal amounts of maintenance in such a dusty environment. Meanwhile, layers of internal shading control glare and unwanted heat gain. The exterior envelope of the tower undulates in waves as it wraps around the core. This glass cladding creates a mirage effect that alludes to its geographic context. The billowing design generates unique floor plans that deviate widely from those found in a typical tall building, resulting in an assortment of multiform spaces.

A number of design elements have been integrated into the building in order to increase its energy efficiency, including solar collectors and a ventilated three-skin façade. Additionally, local building materials were used wherever possible during construction to reduce the economic and environmental costs of transporting imported materials.

CTBUH Awards & Distinctions

Best Tall Building Middle East & Africa 2015 Winner

2015 CTBUH Awards

12 November 2015 | Abu Dhabi

2015 Awards - Session 3 Q&A

Yoram Eilon, Seinor Vice President, WSP | Parsons Brinckerhoff, Kenneth Lewis, Managing Partner, Skidmore, Owings & Merrill, Hin Kong Poon, Deputy Chief Development Officer, CapitaLand...

12 November 2015 | Abu Dhabi

A Landmark in the Heart of the City: Burj Mohammed Bin Rashid, Abu Dhabi

Toby Blunt, Partner, Foster + Partners, and Robert Halvorson, Executive Vice President, Halvorson and Partners, speak at the 14th Annual Best Tall Building Symposium in...

12 November 2015 | Abu Dhabi

Interview: Burj Mohammed Bin Rashid

Toby Blunt, Partner, Foster + Partners, & Robert Halvorson, Principal, Halvorson and Partners, are interviewed by Chris Bentley regarding the 2015 CTBUH Best Tall Building...

20 October 2018

The Middle East: 30+ Years of Building Tall

CTBUH Research

The Middle East region is hosting its first CTBUH International Conference since 2008. In that year, there were 119 completed buildings of 150 meters or...

31 December 2014

Year in Review: Tall Trends of 2014

Daniel Safarik, Antony Wood, Marty Carver & Marshall Gerometta, CTBUH

An All-Time Record 97 Buildings of 200 Meters or Higher Completed in 2014 and 2014 showed further shifts towards Asia, and also surprising developments in...

14 November 2013

The Middle East: 20 Years of Building Skyscrapers

CTBUH Research

Twenty years ago, the Middle East contained only one skyscraper over 150 meters in height. It is now estimated that by the end of 2015...

28 November 2018

The Middle East: 30+ Years of Building Tall

CTBUH has released a Tall Buildings in Numbers (TBIN) interactive data study examining the relationship between high-rise growth and population in the Middle East.

13 October 2016

Top Company Rankings: The World’s 100 Tallest Buildings

The Council is pleased to announce the Top Company Rankings for numerous disciplines as derived from the list of projects appearing in 100 of the World’s Tallest Buildings.

31 December 2014

CTBUH Releases Year in Review: Tall Trends of 2014

An All-Time Record 97 Buildings of 200 Meters or Higher Completed in 2014 and 2014 showed further shifts towards Asia, and also surprising developments in building functions and structural materials.

27 March 2014

CTBUH, EMI Lead Emirates Tall-Building Study Trip

Georges Binder, Belgium Country Leader, recently joined with Executive Master Immobilier to conduct a study trip on tall buildings to the United Arab Emirates.

27 March 2014

CTBUH, EMI Lead Emirates Tall-Building Study Trip

Georges Binder, Belgium Country Leader, recently joined with Executive Master Immobilier to conduct a study trip on tall buildings to the United Arab Emirates.