Filter by
You must be a CTBUH Member to view this resource.
Burj Rafal
Rafal Tower
Building
Completed, 2014
13315
residential / hotel
concrete
307.9 m / 1,010 ft
68
2
474
349
1256
22
6 m/s
92,626 m² / 997,018 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
CTBUH Releases Year in Review: Tall Trends of 2014
31 December 2014 - CTBUH Journal
CTBUH Releases Year in Review: Tall Trends of 2014
31 December 2014 - CTBUH Journal
31 December 2014
Year in Review: Tall Trends of 2014
Daniel Safarik, Antony Wood, Marty Carver & Marshall Gerometta, CTBUH
An All-Time Record 97 Buildings of 200 Meters or Higher Completed in 2014 and 2014 showed further shifts towards Asia, and also surprising developments in...
Located on busy King Fahad Road, just north of the burgeoning King Abdullah Financial District, Burj Rafal was constructed during a boom of high-rise construction which forever changed the fabric of a city which traditionally did not have tall buildings. The building boom in the process created a new market for high-rise residential living for which no such accommodations had existed before in the city of Riyadh. The Burj Rafal was the first residential condominium tower to be built in the region’s then unproven market.
The tower was designed to differentiate itself from other living options in a number of ways beyond the supertall height. At the base, the tower is set within a 20,000 square meter property which features gardens and an offset podium topped with an amenity deck. The tower’s residences share luxury services with a Kempinski Hotel located in the lower floors and were designed to accommodate the needs of Saudi Arabia’s typically large family sizes and strong cultural desire for privacy. As such, there is a higher than usual concentration of large units designed as duplexes, in which bedroom areas are vertically stacked above living spaces and separate entrances can be utilized for the family areas of the home versus those for guests and entertaining.
The design proved to be successful with 70 percent of the condominium units sold by the time the Burj Rafal’s construction had topped out. While other high-rise buildings with residential uses are now being constructed in Riyadh, Burj Rafal remains unique in not only with height, but also with its highly visible location as a standalone tower on the city’s main north-south thoroughfare.
31 December 2014
Year in Review: Tall Trends of 2014
An All-Time Record 97 Buildings of 200 Meters or Higher Completed in 2014 and 2014 showed further shifts towards Asia, and also surprising developments in...
31 December 2014
Year in Review: Tall Trends of 2014
An All-Time Record 97 Buildings of 200 Meters or Higher Completed in 2014 and 2014 showed further shifts towards Asia, and also surprising developments in...
01 April 2013
Fast-growing Saudi Arabia Embraces Tall Buildings
Amid a rapidly changing cultural and economic landscape in Saudi Arabia, John Harris, co-head of Jones Lang LaSalle’s Saudi Arabia office, discusses the shifts in...
31 December 2014
An All-Time Record 97 Buildings of 200 Meters or Higher Completed in 2014 and 2014 showed further shifts towards Asia, and also surprising developments in building functions and structural materials.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy