You must be a CTBUH Member to view this resource.
Cecil and Ida Green Center for Earth Sciences
Green Building, MIT Center for Earth Sciences
Building
Completed, 1964
02139
education
concrete
84.4 m / 277 ft
21
12,124 m² / 130,502 ft²
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy