108
Global
Height rank

Chrysler Building

New York City
Height 318.9 m / 1,046 ft
Floors 77
Official Name
The current legal building name.

Chrysler Building

Type
CTBUH collects data on two major types of tall structures: 'Buildings' and 'Telecommunications / Observation Towers.' A 'Building' is a structure where at least 50% of the height is occupied by usable floor area. A 'Telecommunications / Observation Tower' is a structure where less than 50% of the structure's height is occupied by usable floor area. Only 'Buildings' are eligible for the CTBUH 'Tallest Buildings' lists.

Building

Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished

Completed, 1930

Country
The CTBUH follows the United Nations's definition of Country, and thus uses the lists and codes established by that organization.

United States

City
The CTBUH follows the United Nations's definition of City, and thus uses the lists and codes established by that organization.

New York City

Postal Code

10174

Function
A single-function tall building is defined as one where 85% or more of its usable floor area is dedicated to a single usage. Thus a building with 90% office floor area would be said to be an "office" building, irrespective of other minor functions it may also contain.

A mixed-use tall building contains two or more functions (or uses), where each of the functions occupy a significant proportion of the tower's total space. Support areas such as car parks and mechanical plant space do not constitute mixed-use functions. Functions are denoted on CTBUH "Tallest Building" lists in descending order, e.g., "hotel/office" indicates hotel function above office function.

office

Structural Material
Steel
Both the main vertical/lateral structural elements and the floor spanning systems are constructed from steel. Note that a building of steel construction with a floor system of concrete planks or concrete slab on top of steel beams is still considered a “steel” structure as the concrete elements are not acting as the primary structure.

Reinforced Concrete
Both the main vertical/lateral structural elements and the floor spanning systems are constructed from concrete which has been cast in place and utilizes steel reinforcement bars.

Precast Concrete
Both the main vertical/lateral structural elements and the floor spanning system are constructed from steel reinforced concrete which has been precast as individual components and assembled together on-site.

Mixed-Structure
Utilizes distinct systems (e.g. steel, concrete, timber), one on top of the other. For example, a steel/concrete indicates a steel structural system located on top of a concrete structural system, with the opposite true of concrete/steel.

Composite
A combination of materials (e.g. steel, concrete, timber) are used together in the main structural elements. Examples include buildings which utilize: steel columns with a floor system of reinforced concrete beams; a steel frame system with a concrete core; concrete-encased steel columns; concrete-filled steel tubes; etc. Where known, the CTBUH database breaks out the materials used in a composite building’s core, columns, and floor spanning separately.

steel

Energy Label

LEED Gold

Height
Architectural
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the architectural top of the building, including spires, but not including antennae, signage, flag poles or other functional-technical equipment. This measurement is the most widely utilized and is employed to define the Council on Tall Buildings and Urban Habitat (CTBUH) rankings of the "World's Tallest Buildings."

318.9 m / 1,046 ft

To Tip
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest point of the building, irrespective of material or function of the highest element (i.e., including antennae, flagpoles, signage and other functional-technical equipment).
318.9 m / 1,046 ft
Occupied
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest occupied floor within the building.
252.3 m / 828 ft
Observatory
238.7 m / 783 ft
Floors Above Ground
The number of floors above ground should include the ground floor level and be the number of main floors above ground, including any significant mezzanine floors and major mechanical plant floors. Mechanical mezzanines should not be included if they have a significantly smaller floor area than the major floors below. Similarly, mechanical penthouses or plant rooms protruding above the general roof area should not be counted. Note: CTBUH floor counts may differ from published accounts, as it is common in some regions of the world for certain floor levels not to be included (e.g., the level 4, 14, 24, etc. in Hong Kong).

77

# of Elevators
Number of Elevators refers to the total number of elevator cars (not shafts) contained within a particular building (including public, private and freight elevators).

32

Top Elevator Speed
Top Elevator Speed refers to the top speed capable of being achieved by an elevator within a particular building, measured in meters per second.

5.08 m/s

Tower GFA
Tower GFA refers to the total gross floor area within the tower footprint, not including adjoining podiums, connected buildings or other towers within the development.

111,201 m² / 1,196,958 ft²

Rankings
#
108
Tallest in the World
#
15
Tallest in North America
#
7
Tallest in New York City
#
37
Tallest Office Building in the World
#
8
Tallest Office Building in North America
#
8
Tallest Office Building in United States
#
5
Tallest Office Building in New York City
#
9
Tallest Steel Building in the World
#
6
Tallest Steel Building in North America
#
6
Tallest Steel Building in United States
#
3
Tallest Steel Building in New York City
Construction Schedule
1928

Construction Start

1930

Completed

Material Supplier

Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).

Developer
WP Chrysler
Architect
Design

Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.

William Van Alen
Structural Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

Ralph Squire & Sons
Main Contractor

The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.

Fred T Ley & Co
Material Supplier

Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).

CTBUH Initiatives

2019 Tall Building Predictions for the Year to Come

22 January 2019 - CTBUH News

Height: The History of Measuring Tall Buildings

16 December 2009 - CTBUH News

Videos

16 September 2014 | New York City

Stainless Steel Claddings for High-Rise Architecture

Especially during the last 20 years stainless steel has become an approved and much valued cladding material for sophisticated architecture. Starting with the first architectural...

Research

01 March 2018

Designing the High-Rise Building from the Inside/Out

Timothy Johnson & Jonathan Ward, NBBJ

For over 100 years, the tall building has largely advanced in technological innovation; however very little has been done in the terms of understanding the...

About Chrysler Building

The Chrysler Building was the first supertall building taking the title of World's Tallest Building after winning a height battle with The Bank of Manhattan. The building claimed the title when it raised an 125-foot spire in just 90 minutes after constructing it in secret. It lost the title of World's Tallest Building 11 months later to the Empire State Building but enjoyed commercial success due to its location next to Grand Central Terminal. In 2009, the Chrysler Building went through a retrofit, gaining the certification LEED Gold for Existing Buildings.

Quick Facts

01 March 2018

Designing the High-Rise Building from the Inside/Out

Timothy Johnson & Jonathan Ward, NBBJ

For over 100 years, the tall building has largely advanced in technological innovation; however very little has been done in the terms of understanding the...

26 October 2015

Steel and the Skyscraper City: A Study on the Influence of Steel on the Design of Tall Buildings

Shelley Finnigan, ArcelorMittal; Barry Charnish, Entuitive; Robert Chmielowski, Magnusson Klemencic Associates

At the turn of the century, building design began to evolve. Improvements included indoor plumbing, the advent of escalators, and creation of the “Chicago window.”...

12 June 2008

The Tallest Buildings in the World: Past, Present & Future

CTBUH Research

Over time, the average height of the 100 tallest buildings in the world has been steadily increasing. However, by 2010, this average height will have...

22 January 2019

2019 Tall Building Predictions for the Year to Come

Check out our monthly predictions based on our industry intelligence to see what trends and milestones will shape the industry in the year to come!

16 December 2009

Height: The History of Measuring Tall Buildings

This article describes some of the events which took place in the Council's long, and sometimes complex, history of measuring tall buildings.