CIBC Square I
81 Bay Street Tower, Bay Park Centre Phase 1, 45 Bay South Tower
Building
Under Construction
M5E 1Z8
office
composite
LEED Platinum
237.8 m / 780 ft
49
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
30 October 2017 | Toronto
Urban Policy Towards Tall Buildings Globally: The Architect’s Perspective
Tall buildings have an important role in defining the character of the City and they help reduce urban sprawl. However, when a building rises above...
17 October 2016
Exploring Geometry and Form in Tall Buildings
Chris Wilkinson, Wilkinson Eyre Architects
Using four tower designs on four continents – the Guangzhou International Finance Center in China, the Crown Sydney Resort Hotel in Australia, 45 Bay Street...
30 October 2017 | Toronto
Urban Policy Towards Tall Buildings Globally: The Architect’s Perspective
Tall buildings have an important role in defining the character of the City and they help reduce urban sprawl. However, when a building rises above...
19 October 2016 | Toronto
Exploring Geometry and Form in Tall Buildings
Wednesday, October 19, 2016. Guangzhou, China. Chris Wilkinson of Wilkinson Eyre, presents at the 2016 China Conference Plenary 5: "Beyond Guangzhou: Other Settings" Using four...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy