You must be a CTBUH Member to view this resource.
Citigroup Centre
Park Plaza
Building
Completed, 2000
2000
office
concrete
243.0 m / 797 ft
50
23
8 m/s
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
26 February 2001
The Citigroup Centre At No. 2 Park Street, Sydney
Mike Haysler, Hyder Consulting; Robert Facioni, Structural Design Solutions
This paper covers the history of this site, a notorious black hole for many years, features achieved working on a design and construct basis and...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy