You must be a CTBUH Member to view this resource.
Edificio Nunoa Capital Office Tower
Building
Completed, 2016
office
concrete
86.0 m / 282 ft
29
4
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Seismic Issues Workshop, Shanghai 2014
16 September 2014 - Event
16 September 2014 | Santiago
Seismic Base Isolation of the Nunoa Capital Building
The 2010 Mw 8.8 Maule Chile earthquake caused more than 30 billion US dollars in direct losses. The indirect losses remain unknown, but it is...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy