You must be a CTBUH Member to view this resource.
Eighth Avenue Place East Tower
EAP, Penny Lane Tower
Building
Completed, 2011
T2P 1E3
office
composite
LEED Platinum
212.3 m / 696 ft
49
5
1143
23
5.08 m/s
100,468 m² / 1,081,429 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
The Peer Review Engineer traditionally comments on the information produced by another party, and to render second opinions, but not to initiate what the design looks like from the start.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
As Canada’s first pre-certified LEED Core & Shell Platinum tower, Eighth Avenue Place East Tower is a dramatic insertion into Calgary’s skyline. The Rocky Mountains were both the inspiration for, and driving factor of, the form and orientation of the building. The faceted pinnacle of the tower adds a dynamic reflective surface and intriguing play of light to the more sober office towers surrounding the site.
The podium of the development was designed to encourage pedestrian activity with a set-back and porous architectural expression, including an urban plaza, protective canopies, and direct connections to public transportation, as well as an open and transparent lobby. Atop the two-story podium sits one of Canada’s largest green roofs, comprising 2,790 square meters of planted area. Between the existing tower and the site of a future development sits a large winter garden, providing space for events, dining, and relaxation for the occupants of the building.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy