You must be a CTBUH Member to view this resource.
Exzenterhaus Bochum
Building
Completed, 2013
44789
office
concrete
88.6 m / 291 ft
25
1
120
10,400 m² / 111,945 ft²
Construction Start
Completed
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
The Exzenterhaus is a major orientation point for the city of Bochum, Germany. Its shape, with 15 polycentric rings set atop the solid foundation of a 22-meter, World War-II-era bomb shelter, would probably make it a landmark at any height. Each floor contains rounded, rentable office space, offering 360-degree views and copious natural light through full-height windows and balconies up to 1.6 meters deep. Communicating spiral staircases between floors in single-tenant spaces are also an option. Further uses may include light displays and use as a projection screen.
The bunker shaft provides a two-story reception area at the base. The remaining bunker floors serve as archival and storage space. The structural design of the building is a tour-de-force. The concrete structure’s floor slabs cantilever up to 4.5 meters but are only 250 mm thick. This is supported by a conical spatial form activating membrane action in the slabs, as well as unbounded, pre-stressed tendons around the slab edges, to counteract cracking.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy