You must be a CTBUH Member to view this resource.
Faros de Panama Torre Central
Building
Never Completed
residential / hotel / office
concrete
346.0 m / 1,135 ft
85
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
06 November 2014
Dream Deferred: Unfinished Tall Buildings
CTBUH Research
Without big dreams, there would be no tall buildings. Conceiving, financing, designing, and constructing a skyscraper is no simple feat, even under the best of...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy