Filter by
You must be a CTBUH Member to view this resource.
Federation Tower - Zapad Tower
Federation Towers - West Tower
Building
Completed, 2008
123100
residential / office
concrete
242.5 m / 796 ft
63
4
18
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Construction Start
Completed
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
Building Tours Accompanying ‘Moscow Gaining Height’
24 October 2008 - Event
CTBUH 2008 Moscow Conference: Gaining Height
22 October 2008 - Conference
The Federation Tower consists of East and West Towers, located on a common multilevel podium. Between the two towers will rise an elevator mast and spire. The elevator mast located between the two towers is connected to them on technical floors by five glass bridge galleries, which are fire protected to give other evacuation routes in the event of emergency. Several observation platforms will be included in the Federation complex, at the 57th and 81st floors. Vertical conveyance between floors is provided by 69 high-speed express elevators, over 20 of which are double-decked elevators.
Power supply at the Federation complex uses a heat recuperation system—heat produced by the building systems is used within the building itself as much as possible with the recuperation coefficient reaching up to 60%. The complex is equipped with special sensors that register changes in basic parameters—temperature, illumination, human presence—in order to react to the change in the MEP systems.
24 October 2008
Following five sessions of knowledgeable speaker presentations, the remaining day and a half of the conference was devoted to technical tours.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy