You must be a CTBUH Member to view this resource.
Flame Tower 1
Flame Tower Residence
Building
Completed, 2013
residential
steel/concrete
181.8 m / 596 ft
39
4
137
1160
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
19 September 2012 | Baku
Innovative and Sustainable High-Rise Façade Systems in Asia
The variety of architectural ideas, the need to save energy and the specific demands of high-rise construction, different locations, locally available construction techniques and climate...
The Baku Flame Towers have become a global symbol for the Baku and Azerbaijan. The flame-shaped silhouette of the buildings was selected to pay homage to Azerbaijan’s nickname as the “land of fire,” a result of the area’s rich deposits of natural gas—which continue to drive the region’s economic development.
The design consists of three towers, each containing a distinct function. The tallest tower contains residential units, commercial office space occupies in the second, and a hotel takes up the third. The podium comprises contains additional retail space on three levels, located directly above the hotel’s ballroom and conference facilities. Two of the three levels of retail are accessible from the exterior, creating a unique cascade of space across the sloped site. The buildings present the opportunity for visitors to move through the shopping mall and walk from one tower to the other, change levels, or walk across the top of the landscaped podium.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy