You must be a CTBUH Member to view this resource.
Haikou Tower 1
Hainan International Exchange Square
Building
On Hold
hotel / residential / office
composite
LEED Gold
428.0 m / 1,404 ft
94
4
356
288
1952
51
10 m/s
387,423 m² / 4,170,186 ft²
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Peer Review Engineer traditionally comments on the information produced by another party, and to render second opinions, but not to initiate what the design looks like from the start.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
The Peer Review Engineer traditionally comments on the information produced by another party, and to render second opinions, but not to initiate what the design looks like from the start.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Peer Review Engineer traditionally comments on the information produced by another party, and to render second opinions, but not to initiate what the design looks like from the start.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
18 October 2016 | Haikou
The Haikou Tower - Signifier and Signified
When designing the “Haikou Towers,” our aim was to go beyond an architecture of mere function or form, but to construct an architecture of meaning....
17 October 2016
The Haikou Tower - Signifier and Signified
Martin Henn, HENN
When designing the “Haikou Towers,” our aim was to go beyond an architecture of mere function or form, but to construct an architecture of meaning....
17 October 2016
The Haikou Tower - Signifier and Signified
When designing the “Haikou Towers,” our aim was to go beyond an architecture of mere function or form, but to construct an architecture of meaning....
01 August 2016
Local Context and Global Workflows: Designing Tall for Today and Beyond
The work of HENN Architects is reflective of the themes of both the previous CTBUH Conference Global Interchanges (New York, 2015) and the upcoming Cities...
26 October 2015
Novel High-rise Typologies – Towards Vertical Urbanism
How can we translate the urban qualities of the horizontal city into the vertical tower? Here, we present four projects that embody design strategies to...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy