You must be a CTBUH Member to view this resource.
HKRI Centre Two
Building
Completed, 2017
office
composite
173.2 m / 568 ft
33
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
17 September 2014 | Shanghai
A New Level of Integration of Design and Construction Solutions
The Dazongli mixed use development in the center of Shanghai city encounters an array of challenges which result from existing buildings on site and city...
16 September 2014
A New Level of Integration of Design and Construction Solutions
Dr. Hongyu Li & Frankie Nip, AECOM
The Dazongli mixed use development in the center of Shanghai city encounters an array of challenges which result from existing buildings on site and city...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy