Hotel Georgia
The Private Residences at Hotel Georgia
Building
Completed, 2012
V6C 1C7
residential / hotel
concrete
158.5 m / 520 ft
50
8
155
328
5
5 m/s
32,814 m² / 353,207 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
The new addition to the historic Hotel Georgia in Vancouver is a mixed-use tower with a unique geometry. The form of the tower was sculpted to provide views of nearby public areas as well as the Seymour and Grouse Mountains to the north of the city. This was accomplished by canting the south and east façades outwards for the first 35 floors, and then receding the top 12 floors to project balconies outward. This form also provides passive shading for parts of the building and optimizes the southwest façade, which incorporates built-in photovoltaic panels, to power the building’s solar blinds.
At its base, the podium of the tower presents a familiar homage to the adjacent Hotel Georgia in a similar materials palette and scale. While connecting with its history, the new structure also includes many technological advancements, such as a geo-exchange heating and cooling system, rainwater harvesting, a green roof, and a high-performance curtain wall system. Lastly, the tower has operable windows in all units to encourage natural ventilation when possible.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy