You must be a CTBUH Member to view this resource.
Infinity by Crown Group
Crown Green Square
Building
Completed, 2019
serviced apartments / hotel
60.0 m / 197 ft
20
4
326
90
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
21 March 2019
Infinity Development in Sydney’s Green Square Nears Completion
SKYE Suites Green Square will be opening its doors over the coming months as part of the AU$575 million (US$409 million) “Infinity” development in Sydney’s...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy