You must be a CTBUH Member to view this resource.
Inland Steel Building
Building
Completed, 1958
60603
office
steel
101.3 m / 332 ft
19
3
7
28,800 m² / 310,001 ft²
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Warm Weather Spaces Walking Tours 2015
17 September 2015 - Event
25 April 2019
Offset Cores: Trends, Drivers and Frequency in Tall Buildings
Dr. Philip Oldfield, UNSW Sydney; Bronte Doherty, BVN Architecture
This research explores the trends, drivers and frequency of offset cores in the world’s tallest buildings. It charts the history of tall building layouts, exploring...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy