You must be a CTBUH Member to view this resource.
Islamic Development Bank Headquarters
Building
Completed, 1993
office
107.0 m / 351 ft
22
3
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
08 August 2017
Improving Energy Performance In Gulf-Region Residential High-Rises
Noura Ghabra & Dr. Lucelia Rodrigues, University of Nottingham; Dr. Philip Oldfield, The University of New South Wales
Energy consumption in Gulf Cooperation Council (GCC) countries has been rising over the last four decades. The residential building sector alone accounts for more than...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy