Filter by
You must be a CTBUH Member to view this resource.
Journal Squared 3
J3
Building
Completed, 2016
residential
concrete
175.0 m / 574 ft
53
538
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Jersey City Urban Tour & Reception
28 October 2015 - Event
27 October 2015 | Jersey City
Jon Kushner of KRE Group is interviewed by Chris Bentley during the 2015 CTBUH New York Conference at the Grand Hyatt New York. John discusses...
27 October 2015 | Jersey City
Jon Kushner of KRE Group is interviewed by Chris Bentley during the 2015 CTBUH New York Conference at the Grand Hyatt New York. John discusses...
26 October 2015 | Jersey City
Gary Handel of Handel Architects is interviewed by Chris Bentley during the 2015 CTBUH New York Conference at the Grand Hyatt New York. Gary discusses...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy