You must be a CTBUH Member to view this resource.
Kabukiza Tower
Kabukiza Theatre Building, Ginza Kabukiza
Building
Completed, 2013
104-0061
office / residential
steel
145.5 m / 477 ft
29
4
Construction Start
Completed
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
2016 China-Japan-Korea Tall Building Forum
8 July 2016 - Event
01 September 2016
Design and Construction of GINZA KABUKIZA
Hiroshi Kawamura, Yoji Ishibashi & Tsutomu Morofushi, Mitsubishi Jisho Sekkei; et al
This paper describes the structural solution for the design of a 29-story high-rise tower, which features a large office space above the Kabukiza Theatre. Kabuki...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy