Filter by
You must be a CTBUH Member to view this resource.
Kanchanjunga Apartments
Building
Completed, 1974
400026
residential
concrete
83.8 m / 275 ft
27
12,000 m² / 129,167 ft²
Construction Start
Completed
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Kanchanjunga Apartment Tower
4 February 2010 - Event
The Remaking of Mumbai, Tour
1 February 2009 - Event
4 February 2010
In Mumbai, a building has to be oriented east-west to catch prevailing sea breezes and to open up the best views of the city.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy