You must be a CTBUH Member to view this resource.
Kazakhstan Pavilion and Science Museum
Building
Completed, 2017
museum
100.0 m / 328 ft
8
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
30 October 2019 | Nur-Sultan
Urban Advances: The Reality and The Virtual
Gordon Gill, Partner at Adrian Smith + Gordon Gill Architecture, speaks at the 2019 CTBUH International Congress in Chicago on 30 October 2019.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy