You must be a CTBUH Member to view this resource.
KölnTriangle
Horion, Triangle Tower, LVR-Turm, Rheinische Zusatzversorgungskasse, RZVK Hochhaus
Building
Completed, 2005
50679
office
103.2 m / 339 ft
29
65,000 m² / 699,654 ft²
Construction Start
Completed
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy