You must be a CTBUH Member to view this resource.
M5V
M5V Life, M5VLife, M5V Condominiums,
Building
Completed, 2011
M5V 1K5
residential
concrete
LEED Gold
124.0 m / 407 ft
34
5
305
22,770 m² / 245,094 ft²
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy