Marina 101
Dream Dubai Marina
Building
Completed, 2017
residential / hotel
concrete
425.0 m / 1,394 ft
101
6
506
281
677
29
6 m/s
120,706 m² / 1,299,269 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
The Middle East: 30+ Years of Building Tall
28 November 2018 - CTBUH Research
Top Company Rankings: The World’s 100 Tallest Buildings
13 October 2016 - CTBUH Research
20 October 2018
The Middle East: 30+ Years of Building Tall
CTBUH Research
The Middle East region is hosting its first CTBUH International Conference since 2008. In that year, there were 119 completed buildings of 150 meters or...
With architectural elements reminiscent of art-deco design, Marina 101 stands out in a city full of supertall structures. Located in the tightly packed Dubai Marina district, the building is just steps away from the Persian Gulf and is surrounded by several major high-rise complexes, as well as the famed Palm Jumeirah Island development. The tower will accommodate serviced apartments and the Middle East’s first Hard Rock Hotel.
The design of the structure fully embraces a wide range of aesthetic influences. Rather than just building straight towards the sky, Marina 101’s architects added numerous visual elements to perforate and diffuse the building’s exterior. Flared projections acting as light dishes break the vertical monotony of the supertall tower as it rises, culminating in a 45-meter crown that caps the building and sets it apart in the surrounding skyline. The façade consists of a granite base, two-tone aluminum cladding along the height of the tower, and double glazing to reduce heat again. At night the subtly lit crown will be clearly visible from the Dubai airport. It will consist of sky blue aluminum panels converging to a dramatic four-point pinnacle.
Within the tower, the vertical transportation system consists of a total of 28 elevators, ranging from low-speed service elevators to high-speed high-rise elevators. The six basements and the tower sit on a four-meter-thick raft foundation supported by 280 friction grip piles, ranging from 80 centimeters to 150 centimeters in diameter. The forest of piles, gripped by the surrounding strata, will ensure the safety and stability of the structure.
20 October 2018
The Middle East: 30+ Years of Building Tall
The Middle East region is hosting its first CTBUH International Conference since 2008. In that year, there were 119 completed buildings of 150 meters or...
05 February 2018
2017: Skyscraper History’s Tallest, Highest- Volume, and Most Geographically Diverse Year
This 2017 Tall Building Year in Review / Tall Buildings in Numbers data analysis report shows that more buildings of 200 meters’ height or greater...
31 December 2014
Year in Review: Tall Trends of 2014
An All-Time Record 97 Buildings of 200 Meters or Higher Completed in 2014 and 2014 showed further shifts towards Asia, and also surprising developments in...
14 November 2013
The Middle East: 20 Years of Building Skyscrapers
Twenty years ago, the Middle East contained only one skyscraper over 150 meters in height. It is now estimated that by the end of 2015...
28 November 2018
CTBUH has released a Tall Buildings in Numbers (TBIN) interactive data study examining the relationship between high-rise growth and population in the Middle East.
13 October 2016
The Council is pleased to announce the Top Company Rankings for numerous disciplines as derived from the list of projects appearing in 100 of the World’s Tallest Buildings.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy