office
concrete
151.0 m / 495 ft
36
4
10
71,292 m² / 767,381 ft²
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
20 October 2018
Polycentric Cities: The Future of Vertical Urbanism
CTBUH 2018 Conference Speakers
As we approach the new normality of cities housing 10 million or more inhabitants, those best positioned for the future are evolving along polycentric, multi-nodal...
The 32-story-tall Mashreq Bank Headquarters, with its boldly cantilevered form, forms a prominent gateway to the Dubai Mall / Downtown Dubai area. In contrast to the futuristic glass and steel towers of Dubai, this is a simple form clad in stone panels. The L-shaped typical floor plate opens to the north, with its orientation allowing offices on both sides of the courtyard to have clear glazing protected from solar gain by the building itself. These facades allow panoramic views toward Sheikh Zayed Road.
The glass facades of the building capture daylight and limit solar gain through a sophisticated series of horizontal and vertical shading devices that articulate the building’s primary facades. The design mitigates glare without obscuring views of the surrounding cityscape, including the Burj Khalifa to the east. The screen elements provide dynamic perspectives of the building when viewed from different angles. Its bold massing can appear transparent or massive depending upon the specific vie