You must be a CTBUH Member to view this resource.
Menara Felda, Platinum Park
Federal Land Development Authority Tower
Building
Completed, 2012
40100
office
concrete
215.5 m / 707 ft
50
2
839
28
4 m/s
72,315 m² / 778,392 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
The Platinum Park development, of which Menara Felda is a part, is situated directly to the east of the Kuala Lumpur City Center (KLCC), and connected by several acres of park area. Menara Felda is sited within this new complex. The tower itself presents a curving and dynamic form, inspired by the client’s desire to display a progressive image and to emphasize the negative space between the new tower and its context. Cut into the oval shape of the floor plates are balconies which twist around the façade of the building, breaking the pattern of the cladding.
The façade also incorporates horizontal sunshades to minimize direct solar gain while increasing indirect daylighting. The podium of the building houses a ten-story parking garage which is intended to be covered in full-height planted green walls on two faces, countering the heat and exhaust emitted from the cars within. The planted walls along with the street-level landscaping connect directly to the core park area at the center of the complex, and to KLCC beyond.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy