Filter by
You must be a CTBUH Member to view this resource.
MesseTurm
Trade Fair Tower
Building
Completed, 1990
60327
office
concrete
256.5 m / 842 ft
64
2
930
24
69,700 m² / 750,245 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
Helmut Jahn Discusses His Lifetime's Work
18 October 2012 - Awards Symposium Video
Jewelers Building Tour
17 December 2010 - Event
11 June 2013 | Frankfurt am Main
City-Scapes: Transformations + Interventions
In our journey from Chicago to New York, the United States, South Africa, Europe, the Mideast to Asia/China, the tall building has always been tied...
11 June 2013 | Frankfurt am Main
City-Scapes: Transformations + Interventions
In our journey from Chicago to New York, the United States, South Africa, Europe, the Mideast to Asia/China, the tall building has always been tied...
11 June 2013 | Frankfurt am Main
Interview: Prefabrication and Materiality
Helmut Jahn of JAHN is interviewed by Jeff Herzer during the 2013 CTBUH London Conference at The Brewery, London. Helmut talks about the feasibility of...
18 October 2012 | Frankfurt am Main
Lynn S. Beedle Lifetime Achievement Award: Archi-neering Tall
Never predictable, never simplistic, Helmut Jahn has developed a complex portfolio of iconic buildings around the world. Standout projects include the Sony Center in Berlin,...
18 October 2012
Never predictable, never simplistic, Helmut Jahn has developed a complex portfolio of iconic buildings around the world. Standout projects include the Sony Center in Berlin, Xerox Center in Chicago, Liberty Place in Philadelphia and the MGM Veer Towers in Las Vegas. Once defined as a modernist, he broke away from rigid labels to create his own blends of efficient structures, paving the way for a new era of sustainable buildings.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy