This project was redesigned in 1950 and replaced by Metropolitan Life North Building
You must be a CTBUH Member to view this resource.
Metropolitan Life North Annex
Building
Never Completed
10100
office
steel
100
30
Proposed
Construction Start
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
06 November 2014
Dream Deferred: Unfinished Tall Buildings
CTBUH Research
Without big dreams, there would be no tall buildings. Conceiving, financing, designing, and constructing a skyscraper is no simple feat, even under the best of...
Originally planned to be a 100-storey building, but construction was halted in 1933 at the 29th floor, resulting in the existing building: Metropolitan Life North Building.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy