Filter by
You must be a CTBUH Member to view this resource.
Mirador Building
Building
Completed, 2005
residential
concrete
63.4 m / 208 ft
21
156
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
18 October 2016 | Madrid
Tall Buildings and Context: Appropriate High Rise Vernaculars
The issue of skyscraper form and expression being appropriate to cultural and social context is currently a hotly debated topic in China, as well as...
17 October 2016
What’s Next?: How Do We Make Vertical Urban Design?
Winy Mass, MVRDV
It seems sometimes as if the further away from the ground we rise, the more architectonic and less urban our buildings become. Skyscrapers have always...
18 October 2016 | Madrid
Tall Buildings and Context: Appropriate High Rise Vernaculars
The issue of skyscraper form and expression being appropriate to cultural and social context is currently a hotly debated topic in China, as well as...
18 October 2016 | Madrid
What’s Next?: How Do We Make Vertical Urban Design?
It seems sometimes as if the further away from the ground we rise, the more architectonic and less urban our buildings become. Skyscrapers have always...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy