Filter by
You must be a CTBUH Member to view this resource.
Nation Towers Residential Lofts
Building
Completed, 2012
60476
residential
concrete
268.0 m / 879 ft
64
2
360
2077
11
5 m/s
74,545 m² / 802,396 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
CTBUH Releases Year in Review: Tall Trends of 2012
31 December 2012 - CTBUH Journal
CTBUH Releases Year in Review: Tall Trends of 2011
31 December 2011 - CTBUH Journal
31 December 2012
Year in Review: Tall Trends of 2012
Kevin Brass, Antony Wood & Marty Carver, CTBUH
For the first time in six years the number of tall buildings completed annually around the world declined as the effects of the global financial...
Sited on Abu Dhabi’s Corniche, the Nation Towers complex is a mixed-use development that takes advantage of its location to provide an array of amenities in a striking setting. Tower 1 is entirely residential, comprising apartments and two-story lofts. Tower 2 houses office spaces on the lower floors and the St. Regis luxury hotel above them. The towers are connected at the 48th floor with a skybridge housing a large presidential suite for the St. Regis Hotel.
The complex includes a variety of amenities, including retail and entertainment facilities, as well as access to the nearby beaches. The towers were oriented to take advantage of views while also minimizing solar exposure. The podium houses retail and office spaces, and the roof has a spa and pool deck as well as planted areas which offer views of the surrounding water.
To minimize environmental impact, several sustainable features were incorporated: for example, zero-potable water irrigation; low-flow plumbing fixtures; and energy-efficient lighting.
31 December 2012
Year in Review: Tall Trends of 2012
For the first time in six years the number of tall buildings completed annually around the world declined as the effects of the global financial...
31 December 2011
Year in Review: Tall Trends of 2011
The annual story is becoming a familiar one: 2007, 2008, 2009, 2010, and now 2011 have each sequentially broke the record for the most 200...
31 December 2012
For the first time in six years the number of tall buildings completed annually around the world declined as the effects of the global financial crisis became evident.
31 December 2011
The annual story is becoming a familiar one: 2007, 2008, 2009, 2010, and now 2011 have each sequentially broke the record for the most 200 meter or higher buildings completed in a given year. Once again, more 200 m+ buildings were completed in 2011 than in any year previous.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy