Note: As this project is architecturally topped out, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by the CTBUH.
You must be a CTBUH Member to view this resource.
Ningbo Guohua Financial Tower
国华金融大厦
Building
Architecturally Topped Out
office
composite
China Green Building Label: 3 Star; LEED Gold BD+C: Core and Shell
206.9 m / 679 ft
45
110,995 m² / 1,194,740 ft²
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
17 October 2016
Climate-Responsive Exterior Enclosure Design
Keith Boswell & Michael Duncan, Skidmore, Owings & Merrill LLP
In this paper, three different solutions in three different regions of China illustrate best practices for the design and execution of optimized building enclosure systems....
17 October 2016
Climate-Responsive Exterior Enclosure Design
In this paper, three different solutions in three different regions of China illustrate best practices for the design and execution of optimized building enclosure systems....
26 October 2015
Three-dimensional Exterior Bracing Systems for Tall Buildings
The use of outriggers with and without belt trusses has become an expedient of choice for harnessing the three dimensional potential of tall buildings to...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy