You must be a CTBUH Member to view this resource.
Nissei Dowa Kasai Sompo Phoenix Tower
Dowa Kasai Phoenix Tower, NDGI Phoenix Tower
Building
Completed, 1995
office
steel
132.0 m / 433 ft
29
3
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy