Filter by
You must be a CTBUH Member to view this resource.
One Bloor Street East
One Bloor
Building
Completed, 2017
M4W 1A9
residential
concrete
257.3 m / 844 ft
78
6
789
531
6
8 m/s
78,301 m² / 842,825 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
CTBUH Study Examines Tallest Buildings with Dampers
22 August 2018 - CTBUH Research
Canada Event Considers “The Story of Marketing Tall Buildings”
20 June 2017 - Event
18 October 2016 | Toronto
One Yonge: A Case Study for Complete Vertical Communities
Tuesday October 18, 2016. Shenzhen, China. David Pontarini of Hariri Pontarini Architects, presents at the 2016 China Conference Session 7a: Urban Environmental Issues. The City...
17 October 2016
One Yonge: A Case Study for Complete Vertical Communities
David Pontarini, Hariri Pontarini Architects
The City of Toronto is experiencing rapid growth, with the second largest concentration of high-rise buildings under construction in North America, surpassing Chicago and coming...
17 October 2016
One Yonge: A Case Study for Complete Vertical Communities
The City of Toronto is experiencing rapid growth, with the second largest concentration of high-rise buildings under construction in North America, surpassing Chicago and coming...
01 December 2012
Twenty-six buildings taller than 150 meters have been built in Canada since 2005 and it added four buildings taller than 200 meters in 2012, the...
22 August 2018
CTBUH has released a Tall Buildings in Numbers (TBIN) interactive data study on the world's tallest buildings with dampers.
20 June 2017
Building up momentum for the CTBUH 2017 Conference in Australia, the CTBUH Canada Chapter held its most recent event at the University of Toronto Faculty Club.
30 October 2015
CTBUH 2015 delegates toured Toronto under the lead of CTBUH Canada. The highly successful tour led to many discussion on the lessons learned.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy