Filter by
You must be a CTBUH Member to view this resource.
One Canada Square
Canary Wharf DS7
Building
Completed, 1991
E14 5AB
office
steel
236.0 m / 774 ft
50
3
900
36
162,422 m² / 1,748,296 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Seven Cities Winter Spaces Walking Tour
29 January 2015 - Event
Activity at the CTBUH London Conference: Day Three
13 June 2013 - Conference
13 April 2011
Tall and Urban: An Analysis of Global Population and Tall Buildings
CTBUH Research
Tall buildings are spreading across the globe at an ever-increasing rate. This study demonstrates the relationship between population and tall buildings across those countries and...
13 April 2011
Tall and Urban: An Analysis of Global Population and Tall Buildings
Tall buildings are spreading across the globe at an ever-increasing rate. This study demonstrates the relationship between population and tall buildings across those countries and...
16 October 2005
An Aesthetics of Sustainability
Cesar Pelli recently completed the design of two tall buildings: one in Madrid and one in the United Arab Emirates, both extreme climatic conditions. Both...
29 January 2015
The new CTBUH Urban Habitat / Urban Design Committee organized a highly successful Winter Spaces Walking Tour in seven cities around the world.
13 June 2013
Tall Building Industry Gathers in London See the highlights from the tall building event of the year…
13 June 2013
A tour of Canary Wharf is an object lesson in the kind of place-making that can stem from the exploitation of an increasing rarity and developer’s delight: a 100-acre blank space in a major metropolitan area.
13 April 2011
Tall buildings are spreading across the globe at an ever-increasing rate. This study demonstrates the relationship between population and tall buildings across those countries and presents information on the average height and age of each country’s tallest buildings.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy