You must be a CTBUH Member to view this resource.
One One One Eagle Street
Building
Completed, 2012
4000
office
composite
6 Star Green Star
194.7 m / 639 ft
48
7
114
21
8 m/s
88,345 m² / 950,938 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
Warm Weather Spaces Walking Tours 2015
17 September 2015 - Event
The site for the new tower on Eagle Street had several limitations and opportunities at the beginning of design which were addressed in creative ways through the process. An existing ramp and loading dock structure serving neighboring buildings was in place, limiting the design for the building core and column placement. Taking inspiration from the nearby fig tree groves, the structural design team devised an organic support system which transfers the loads in non-linear paths. This organic structure is expressed on the interior of the façade and exposed at the crown as a unique feature of the building.
In addition to the innovative organic structure, a “top-down” construction methodology was implemented which allowed the construction of the seven-level basement to coincide with the erection of the tower. “Plunge columns” were driven into the foundation piles from the ground level, which provided the necessary support for the towers while the basements were being excavated. This process saved roughly 6–12 months of construction time.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.